Photograph context, then detail.
Start with a wide view of the wall, roof line, room, or elevation. Add closer images of cracks, staining, openings, transitions, or incomplete work. Daylight and steady framing are more useful than heavy zoom.
Project planning guide / reviewed July 25, 2026
Use this guide to prepare for a framing, stucco, drywall, addition, ADU, renovation, or tenant-improvement review. Project conditions and legal requirements vary, so confirm them with the appropriate agency and qualified professionals.
Safety first. Do not climb onto a roof, open a wall, disturb damaged material, or enter an unsafe work area to collect photographs. Ground-level context is enough to begin.
Start with a wide view of the wall, roof line, room, or elevation. Add closer images of cracks, staining, openings, transitions, or incomplete work. Daylight and steady framing are more useful than heavy zoom.
Share the latest plan revision, structural sheets, approved changes, permits, inspection records, and previous proposals available. Mark documents that may be outdated instead of presenting them as final.
Note when a condition appeared, what weather or construction event came before it, which repairs were attempted, and whether it is changing. A short timeline can prevent the wrong first assumption.
Mention gates, stairs, narrow side yards, overhead lines, hillside access, tenant or family occupancy, pets, parking limits, and areas that need protection.
RavenRock focuses on framing, stucco, and drywall. Project fit is confirmed after reviewing the location, plans or visible conditions, current stage, access, and the work that must happen before or after the requested trade.
Yes. A current architectural and structural set, relevant details, revision status, project location, desired timing, and a short scope summary create a useful starting point. Do not send sensitive files through the website form; call first to confirm a secure sharing method.
RavenRock reviews framing, stucco, and drywall scopes for ADUs, additions, new construction, renovations, and tenant improvements. Exact availability and scope are confirmed project by project.
Share the city or ZIP, current plans if available, project stage, inspection status, safe photographs, access constraints, and the trade decision or condition you need to resolve.
Photographs can help establish fit, but a credible scope may also require current plans, field measurements, a walkthrough, clarification of existing conditions, and confirmation of what other trades or project professionals will provide.
No. The site offers planning information only. Structural, code, permit, life-safety, and assembly-specific decisions must be confirmed through the project’s qualified professionals, approved documents, manufacturers, and reviewing authority.
Official California and Los Angeles sources
Verify a California contractor license by business name or license number.
Open source ↗Official sourceOfficial consumer guidance for bids, contracts, licenses, and home-improvement work.
Open source ↗Official sourceCity of Los Angeles plan review, permit, inspection, and property-record services.
Open source ↗Keep the project moving
Start with the city or ZIP, trade, current stage, timing, and any plans or safe photographs already available.